During two working sessions today I got most of the assembly of the lower main spars complete. “Most of”, because when it came to laying out the plywood blocks for the landing wire attach points… well, after a while studying the parts and the prints and the spars, none of it makes any sense. The upper wing spars were not exactly straightforward; a few of the parts didn’t match the plans, but the end result looked correct in that the location and final layout of the blocks matches the print, even if the parts making up those blocks are a bit different. I’ll need to spend more time studying the plans for the spars, as well as the plans for the N-struts and landing wires to figure out what needs to be done.
I also ordered a gallon of T-88, hopefully I’ve got enough to last me until it gets here mid-week.
Edit: After looking at print #15 of the plans, things are quite a bit clearer. That drawing shows the flying wire, landing wire, and N-strut attachments, with part of the spars shown. Tomorrow I’ll be able to glue in the blocks for the lower main spars and, hopefully, get them finished. Well… “finished” is a relative term, I suppose. I haven’t started attaching the parts for the wingtip bow support, but I may just hold off on that for the time being.