Bottom geodetic and false spars

Yesterday I got the rest of the compression member gussets glued in, then cut and glued in all but two of the bottom geodetic braces. Those two I couldn’t get in because of a clamp holding a gusset in place. I also got about a quarter or so of the geodetic intersections glued and clamped before running out of epoxy.

Today I finished up the geodetic members, and had enough glue left to install the false spars on the front of the ribs. I think I may have actually used all of the spring clamps I had over there… in fact I know I did, because today I took over another dozen I’d gotten for Christmas a couple years back, that had been sitting in a gift bag in the basement. I think there were a couple left today, but certainly less than a dozen.

Top geodetic glued in

Yesterday I went over and cut all of the geodetic braces for the top of the wing. Unfortunately, I’d neglected to take over any epoxy – and I’d finished up the last pair of syringes earlier in the week. I remedied that today.

My strategy of using the geodetic braces to shim the rib cap to spar cap joint worked a treat, as the Brits say. It saved me time and trouble. Most were a close fit, and a couple pieces needed sanding to slip in snugly.

I thought I was going to use a record number of clamps, but then I remembered the wingtip bow laminations. Still, it looked like a lot of clamps.

Everything glued and clamped in place. Joints that aren’t clamped are a snug fit and don’t need it.

Compression members in (lower left wing)

Over the past few days, I have gotten the rest of the ribs glued to the rear spar. I’ve left them unattached to the top of the main spar, as I’m planning to just run the geodetic braces between the rib cap and spar rather than use a separate shim between the cap and spar.

Today I got all four of the compression member assembles cut, fitted, and glued in place, and glued plywood gussets on some of the joints. I ran out of time before I could get the remainder of the gussets cut and glued in.

The State of the Wing address

The main and rear spars are in place, and half the ribs are glued to them. It’s tedious and intense work, so I’ll finish them up tomorrow.

I dug the CW42 and CW43 plywood pieces for the wing walk out of the crate and tried test fitting them. As with many of the kit pieces, they simply don’t fit. At all. The nose reinforcing pieces will be usable, with some trimming. The rear pieces… not so much. Once the ribs are fully secured I’ll see if they can be used at all, or if I’ll need to order some new plywood and cut new ones. At the very least, the notches for the cross braces are rounded at the bottom from being cut out with a router with a fairly large bit. I can clean those up with a band saw, but the ends are also not right by a long shot. It will take some work to figure out how or if I can use these.

All in all I’m just happy I didn’t pay full price for this “kit”. I’ve found an awful lot of pieces that, quite frankly, I’d have probably been better off making myself. But at least now I know what to expect.

New month, new wing

Yesterday I made the call to stop work on the lower left wing and start on the lower right. The remaining things to do on the first wing are all attachment hardware and pre-fabric finishing. Some of those things, like attaching the N strut and landing wire brackets, would make it more difficult to store. I think it will be better to build the other lower wing, then varnish and add the attach brackets to both at the same time.

So, we put the wing on a storage rack in a corner of the shop, and I started laying out the parts for the right wing. We figured out the trailing edge pieces and got them clamped to the bench rail, then slotted in the five ribs I had over there and slid the main spar into place. I’ll need to take over another batch of ribs and get them modified as I did the other wing to clear the torque tube. I spent the better part of six months on the first wing, if you count the time spent on spars and wingtip bows. If you count just the wing assembly time, it was more like four months. A lot of that time was spent on the leading edge wrapping and aileron construction. I’m hoping I can speed that up quite a bit and have this one done quicker, even though this one will include the wing walk.

Mocked up, nothing glued yet. Need to take more ribs over!